FAQs
What is the process like?
Getting started is simple. Fill out our design form, and we’ll provide a detailed quotation. Once approved, we’ll share a project deck outlining the design and execution timeline. After finalizing the design, we move into planning and on-site execution.
What is the cost of a mural?
The cost depends on the size of the wall, required manpower, and the complexity of the design and overall project. Share your project details with us, and we’ll assess costs to provide an accurate quotation tailored to your needs. If you have a fixed budget in mind, please let us know, and we’ll explore feasible solutions to meet your project needs.
How long does an average mural painting take to complete?
Timelines vary based on size, design complexity, and feedback turnaround. For a standard mural (6m x 3m), the process typically takes:
• Design development: 4–6 weeks
• Logistics preparation: 1 week
• Painting on-site : 5–7 days on-site
Larger projects may take 2–4 weeks for painting, depending on the scale and intricacy. In total, an average mural is completed within 6–8 weeks.
What are the working hours like and how many artists will be on-site?
Our team typically works Monday to Friday, 10 AM to 6 PM. Weekend or night work is available upon request but may incur additional costs. A typical team includes 3–5 artists to complete most projects within 1–2 weeks, minimizing inconvenience to you.
What type of paints do you use? Does it smell? How long does the paints the paint take to dry and how long will the mural last?
We use NIPPON Vinilex 5000, a water-based, low-odor emulsion paint suitable for indoor and outdoor use.
• Drying Time:
Surface dries in 30 minutes; fully dries in 1–2 hours.
• Durability:
With proper maintenance, murals last 5–8 years without touch-ups.
Our paint is virtually odorless, allowing us to work in occupied spaces without disruptions. (Safety data sheets are available upon request.)
How many design changes can I make and what is considered a design revision?
You’re entitled to three design revisions during the project timeline.
• Minor Adjustments:
Small changes (e.g., color tweaks or repositioning elements) are part of the refinement process and don’t count as full revisions.
• Full Revisions:
Major changes (e.g., reworking the concept or layout) count as one revision and require extra design time.
What does the quotation include?
Our quotations are all-inclusive, covering:
1. Creative Work: Mural design concepts and sketches with up to 3 revisions.
2. Team: Art director, designer, project manager, painters.
3. Materials: Paints, brushes, palettes, and drop sheets.
4. Logistics: Coordination, transportation, storage, ladders, and equipment rentals (if required).
5. Operational Costs: Insurance, overheads, and project management.
6. Care Package: A one-year complimentary warranty for minor touch-ups.
What is the complimentary care package?
Every mural includes a one-year Complimentary Care Package, which covers: One Minor Touch-Up - Fixes for material or workmanship defects, such as blistering, algae growth, uneven fading, peeling, or discoloration. (Excludes vandalism, internal spillages, or accidents.)
Do we need to prepare anything on-site before the painting?
To ensure a smooth process, please prepare:
• Storage Space: For materials and tools.
• Ladders: If available on-site.
• Power Outlet: For projection equipment.
• Wash Point: For cleaning brushes.
• Background Paint: Share the color code for touch-ups.
• Access Passes: Coordinate with your security team if required.